powertracker
AI data centers in US grid context.
map
rankings
schedule
back to Box Elder County
Campus
Stratos Project
O'Leary Digital (MIDA) · Snowville, Utah
9.0 GW
Announced load
Utility
Rocky Mountain Power
Balancing authority
PACE
Status
Proposed (2030)
Operator
O'Leary Digital (MIDA)
County resi rate Δ
+13.6%
Population (2024 ACS)
61K
Median HH income (2024 ACS)
$84,550
Open on map →
Source
https://www.sltrib.com/news/2026/05/04/utah-data-center-final-vote-box/