powertracker — rankings
Where the AI data-center buildout is concentrating, county by county.

The 30 US counties absorbing the AI buildout

Across 144 publicly known AI and hyperscaler campuses in 114 counties across 36 states, operators have announced 90.9 gigawatts of new electricity load. 61% of that load is concentrated in just the top 10 counties below — each one a place where one or two campuses could double or triple the local grid's peak demand.

Tracked campuses
144
Counties hosting
114
States
36
Announced load
90.9 GW
Top-10 share
61%

Top 30 counties by announced megawatts

1

Carson County, Texas

1 proposed
Announced load
11.0 GW
Campuses
1
Lead operator
Fermi America (Rick Perry)
Utility
Xcel Energy SPS
Resi rate Δ (3y)
-0.1%
Home price Δ (3y)
Property tax Δ (3y)
-2.7%
Operators: Fermi America (Rick Perry) · 1 campus
  • Project Matador Fermi America (Rick Perry) · 11.0 GW
2

Pike County, Ohio

1 building
Announced load
10.0 GW
Campuses
1
Lead operator
SB Energy (SoftBank)
Utility
AEP Ohio
Resi rate Δ (3y)
+13.7%
Home price Δ (3y)
Property tax Δ (3y)
+14.4%
Operators: SB Energy (SoftBank) · 1 campus
  • SB Energy Portsmouth SB Energy (SoftBank) · 10.0 GW
3

Box Elder County, Utah

1 proposed
Announced load
9.0 GW
Campuses
1
Lead operator
O'Leary Digital (MIDA)
Utility
Rocky Mountain Power
Resi rate Δ (3y)
+13.6%
Home price Δ (3y)
+5.0%
Property tax Δ (3y)
+19.7%
Operators: O'Leary Digital (MIDA) · 1 campus
  • Stratos Project O'Leary Digital (MIDA) · 9.0 GW
4

Prince William County, Virginia

1 live1 proposed
Announced load
7.0 GW
Campuses
2
Lead operator
QTS
Utility
Dominion Energy Virginia
Resi rate Δ (3y)
+7.2%
Home price Δ (3y)
+7.2%
Property tax Δ (3y)
+7.2%
Operators: AWS, QTS · 2 campuses
  • PW Digital Gateway (QTS) QTS/Blackstone · 7.0 GW
  • Manassas AWS
5

Hood County, Texas

1 proposed
Announced load
5.0 GW
Campuses
1
Lead operator
Sailfish Digital Ventures
Utility
United Cooperative Services
Resi rate Δ (3y)
+6.5%
Home price Δ (3y)
-2.4%
Property tax Δ (3y)
+6.7%
Operators: Sailfish Digital Ventures · 1 campus
  • Comanche Circle Sailfish Digital Ventures · 5.0 GW
6

Racine County, Wisconsin

2 building
Announced load
3.3 GW
Campuses
2
Lead operator
Microsoft
Utility
We Energies
Resi rate Δ (3y)
+11.4%
Home price Δ (3y)
+24.9%
Property tax Δ (3y)
+4.1%
Operators: Microsoft · 2 campuses
  • Fairwater Wisconsin Microsoft · 3.3 GW
  • Mount Pleasant Microsoft
7

El Paso County, Texas

1 proposed
Announced load
3.0 GW
Campuses
1
Lead operator
Carlyle Group
Utility
El Paso Electric
Resi rate Δ (3y)
-3.5%
Home price Δ (3y)
+7.5%
Property tax Δ (3y)
+12.0%
Operators: Carlyle Group · 1 campus
  • Fort Bliss Carlyle Campus Carlyle Group · 3.0 GW
8

Laramie County, Wyoming

2 building1 announced
Announced load
2.6 GW
Campuses
3
Lead operator
Crusoe
Utility
Black Hills Energy
Resi rate Δ (3y)
+13.3%
Home price Δ (3y)
+5.6%
Property tax Δ (3y)
+15.4%
Operators: Crusoe, Meta, Microsoft · 3 campuses
  • Crusoe Wyoming Crusoe/Tallgrass · 1.8 GW
  • Cheyenne (Meta) Meta · 800 MW
  • Cheyenne Campus Microsoft
9

St. Joseph County, Indiana

1 live1 announced
Announced load
2.2 GW
Campuses
2
Lead operator
AWS
Utility
Indiana Michigan Power
Resi rate Δ (3y)
+5.1%
Home price Δ (3y)
+16.8%
Property tax Δ (3y)
+14.6%
Operators: AWS, Microsoft · 2 campuses
  • Project Rainier AWS/Anthropic · 2.2 GW
  • Granger Microsoft
10

Taylor County, Texas

2 building
Announced load
2.1 GW
Campuses
2
Lead operator
OpenAI
Utility
AEP Texas
Resi rate Δ (3y)
Home price Δ (3y)
+5.2%
Property tax Δ (3y)
+9.4%
Operators: Crusoe, OpenAI · 2 campuses
  • Stargate Abilene OpenAI/Microsoft/Oracle/Crusoe · 1.2 GW
  • Crusoe Abilene Phase 2 Crusoe/Microsoft · 900 MW
11

Shelby County, Tennessee

1 live1 building
Announced load
2.0 GW
Campuses
2
Lead operator
xAI
Utility
MLGW
Resi rate Δ (3y)
Home price Δ (3y)
+7.4%
Property tax Δ (3y)
+6.9%
Operators: xAI · 2 campuses
  • Colossus 2 xAI · 2.0 GW
  • Colossus xAI
12

Richland County, Louisiana

1 building
Announced load
2.0 GW
Campuses
1
Lead operator
Meta
Utility
Entergy Louisiana
Resi rate Δ (3y)
Home price Δ (3y)
Property tax Δ (3y)
+10.3%
Operators: Meta · 1 campus
  • Hyperion Meta · 2.0 GW
13

Mason County, West Virginia

1 announced
Announced load
2.0 GW
Campuses
1
Lead operator
Nscale
Utility
Appalachian Power
Resi rate Δ (3y)
+11.6%
Home price Δ (3y)
Property tax Δ (3y)
+2.0%
Operators: Nscale · 1 campus
  • Monarch Nscale/Microsoft · 2.0 GW
14

Nolan County, Texas

1 building
Announced load
2.0 GW
Campuses
1
Lead operator
IREN
Utility
AEP Texas
Resi rate Δ (3y)
Home price Δ (3y)
Property tax Δ (3y)
+4.8%
Operators: IREN · 1 campus
  • Sweetwater IREN · 2.0 GW
15

Pittsylvania County, Virginia

1 proposed
Announced load
2.0 GW
Campuses
1
Lead operator
Stack Infrastructure
Utility
Appalachian Power
Resi rate Δ (3y)
+27.5%
Home price Δ (3y)
-4.1%
Property tax Δ (3y)
+10.6%
Operators: Stack Infrastructure · 1 campus
  • Berry Hill Megasite Stack Infrastructure · 2.0 GW
16

Desoto County, Mississippi

1 proposed
Announced load
2.0 GW
Campuses
1
Lead operator
xAI
Utility
Entergy Mississippi
Resi rate Δ (3y)
+11.3%
Home price Δ (3y)
+3.8%
Property tax Δ (3y)
+6.9%
Operators: xAI · 1 campus
  • xAI Southaven Expansion xAI · 2.0 GW
17

Tooele County, Utah

1 proposed
Announced load
2.0 GW
Campuses
1
Lead operator
CyrusOne (KKR
Utility
Rocky Mountain Power
Resi rate Δ (3y)
+13.6%
Home price Δ (3y)
+2.4%
Property tax Δ (3y)
+20.2%
Operators: CyrusOne (KKR · 1 campus
  • Dugway CyrusOne Campus CyrusOne (KKR/BlackRock) · 2.0 GW
18

Maricopa County, Arizona

3 live2 building1 proposed
Announced load
1.5 GW
Campuses
6
Lead operator
Arizona Land Consulting
Utility
Arizona Public Service
Resi rate Δ (3y)
+15.8%
Home price Δ (3y)
+3.1%
Property tax Δ (3y)
+6.6%
Operators: Apple, Arizona Land Consulting, Google + 2 · 6 campuses
  • Hassayampa Ranch Arizona Land Consulting / Social Capital · 1.5 GW
  • Mesa Meta
  • Goodyear Campus Microsoft
  • El Mirage Campus Microsoft
  • Mesa (Google) Google
  • Mesa (Apple) Apple
19

Trumbull County, Ohio

1 building
Announced load
1.5 GW
Campuses
1
Lead operator
SoftBank
Utility
FirstEnergy
Resi rate Δ (3y)
+3.4%
Home price Δ (3y)
+16.4%
Property tax Δ (3y)
+7.2%
Operators: SoftBank · 1 campus
  • Stargate Lordstown SoftBank/OpenAI/Oracle · 1.5 GW
20

Natrona County, Wyoming

1 proposed
Announced load
1.5 GW
Campuses
1
Lead operator
Prometheus Hyperscale
Utility
Rocky Mountain Power
Resi rate Δ (3y)
+22.8%
Home price Δ (3y)
+6.2%
Property tax Δ (3y)
+7.8%
Operators: Prometheus Hyperscale · 1 campus
  • Prometheus Hyperscale Natrona Prometheus Hyperscale/Spiritus · 1.5 GW
21

Washtenaw County, Michigan

1 proposed
Announced load
1.4 GW
Campuses
1
Lead operator
OpenAI
Utility
DTE Energy
Resi rate Δ (3y)
+8.0%
Home price Δ (3y)
+6.5%
Property tax Δ (3y)
+9.6%
Operators: OpenAI · 1 campus
  • Stargate Saline Township OpenAI/Oracle/Related Digital · 1.4 GW
22

Jackson County, Missouri

1 building1 announced
Announced load
1.2 GW
Campuses
2
Lead operator
Nebius
Utility
Evergy
Resi rate Δ (3y)
+5.8%
Home price Δ (3y)
+10.7%
Property tax Δ (3y)
+11.5%
Operators: Google, Nebius · 2 campuses
  • Independence Nebius · 1.2 GW
  • Kansas City Google
23

Milam County, Texas

1 building
Announced load
1.2 GW
Campuses
1
Lead operator
SoftBank
Utility
Oncor
Resi rate Δ (3y)
Home price Δ (3y)
Property tax Δ (3y)
+10.1%
Operators: SoftBank · 1 campus
  • Stargate Milam County SoftBank/SB Energy/OpenAI · 1.2 GW
24

Licking County, Ohio

3 building1 live
Announced load
1.0 GW
Campuses
4
Lead operator
Meta
Utility
AEP Ohio
Resi rate Δ (3y)
+13.7%
Home price Δ (3y)
+6.0%
Property tax Δ (3y)
+12.2%
Operators: AWS, Google, Meta + 1 · 4 campuses
  • Prometheus Meta · 1.0 GW
  • Heath/Hebron Campus Microsoft
  • New Albany (Google) Google
  • New Albany (AWS) AWS
25

Ozaukee County, Wisconsin

1 building
Announced load
1.0 GW
Campuses
1
Lead operator
Oracle
Utility
We Energies
Resi rate Δ (3y)
+11.4%
Home price Δ (3y)
+13.7%
Property tax Δ (3y)
+3.3%
Operators: Oracle · 1 campus
  • Stargate Lighthouse Oracle/OpenAI/Vantage · 1.0 GW
26

Nueces County, Texas

1 building
Announced load
1.0 GW
Campuses
1
Lead operator
Hut 8
Utility
AEP Texas
Resi rate Δ (3y)
Home price Δ (3y)
Property tax Δ (3y)
+7.8%
Operators: Hut 8 · 1 campus
  • Beacon Point Hut 8 / American Bitcoin · 1.0 GW
27

Reeves County, Texas

1 proposed
Announced load
1.0 GW
Campuses
1
Lead operator
Bolt Data & Energy
Utility
Oncor
Resi rate Δ (3y)
Home price Δ (3y)
Property tax Δ (3y)
+9.3%
Operators: Bolt Data & Energy · 1 campus
  • Bolt West Texas Bolt Data & Energy / Texas Pacific Land · 1.0 GW
28

Luzerne County, Pennsylvania

1 building
Announced load
960 MW
Campuses
1
Lead operator
AWS
Utility
PPL
Resi rate Δ (3y)
-0.3%
Home price Δ (3y)
+21.0%
Property tax Δ (3y)
+5.0%
Operators: AWS · 1 campus
  • Susquehanna Campus AWS · 960 MW
29

Coweta County, Georgia

1 proposed
Announced load
900 MW
Campuses
1
Lead operator
Atlas Development
Utility
Georgia Power
Resi rate Δ (3y)
+8.0%
Home price Δ (3y)
-1.6%
Property tax Δ (3y)
+13.3%
Operators: Atlas Development · 1 campus
  • Project Sail (Newnan) Atlas Development/Prologis · 900 MW
30

Edgecombe County, North Carolina

1 proposed
Announced load
900 MW
Campuses
1
Lead operator
Energy Storage Solutions
Utility
Duke Energy Progress
Resi rate Δ (3y)
Home price Δ (3y)
+11.0%
Property tax Δ (3y)
+6.2%
Operators: Energy Storage Solutions · 1 campus
  • Tarboro Edgecombe Campus Energy Storage Solutions · 900 MW

By state

#StateAnnounced loadCampuses
1Texas28.8 GW26
2Ohio12.7 GW11
3Utah11.0 GW3
4Virginia9.1 GW12
5Wisconsin4.3 GW4
6Wyoming4.1 GW4
7Indiana2.7 GW5
8Tennessee2.0 GW3
9Mississippi2.0 GW3
10Louisiana2.0 GW1
11West Virginia2.0 GW1
12Arizona1.5 GW7
13Kansas1.5 GW2
14Michigan1.4 GW1
15Pennsylvania1.3 GW3

How this is computed

Campus list. Hand-curated from press releases, FOIA filings, local zoning records and news coverage. Every site carries a source URL in data/sites/data_centers.csv. "Announced load" is the publicly disclosed megawatt figure where the operator or utility has stated one; many campuses (especially older hyperscaler builds) have never published a number and contribute zero to the MW total even though they show up in the campus count.

County rollup. Each campus is mapped from its city/state to a Census FIPS code via us_cities.csv + manual overrides for townships and unincorporated sites. Counties are then ranked by the sum of announced megawatts across all campuses they host.

Resi rate Δ. The percent change in the county's lead utility's residential electricity price between 2024 and the mean of 2021–2023, from EIA Form 861. Captures whether households in the county are already paying more for power on a multi-year baseline.

Home price Δ. Percent change in the county's trailing-3-month median sale price (volume-weighted by HOMES_SOLD) against the mean of the prior three same-month windows at t−12 / t−24 / t−36 months. From Redfin Data Center. Counties with < 30 sales in any of those four windows are dropped to no-data.

Property tax Δ. Percent change in the county's median real-estate tax (Census ACS B25103) between the latest 5-year endpoint and the mean of the prior three. ACS 5-year windows overlap by 4 years — treat magnitude as suggestive.

None of these Δs are caused by data centers alone. They are read-outs of what the host community has been paying for electricity and housing in the years the campus was being planned and built — the context that's missing from most press-release coverage.