BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//powertracker.io//Key Votes Calendar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:powertracker - AI data-center key votes
X-WR-CALDESC:Upcoming and recent US local-government votes\, regulator de
 cisions\, court rulings and permit hearings that gate AI / hyperscaler d
 ata-center campuses tracked by powertracker.io
X-WR-TIMEZONE:UTC
REFRESH-INTERVAL;VALUE=DURATION:P1D
BEGIN:VEVENT
UID:031f47fa355b8501@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20251210
DTEND;VALUE=DATE:20251211
SUMMARY:[powertracker] Rezoning - Bessemer Hyperscale Campus (Bessemer\, 
 AL)
DESCRIPTION:Approved initial 700-acre rezoning from agricultural to indus
 trial for Project Marvel\n\nSite: Bessemer Hyperscale Campus\nDecision b
 ody: City Council\nAction: Rezoning\nOutcome: Approved\nSource: https://
 www.bhamwiki.com/w/Bessemer_Hyperscale_Data_Center\nPowertracker site pa
 ge: https://powertracker.io/site/bessemer-hyperscale-campus
LOCATION:Bessemer\, AL
URL:https://www.bhamwiki.com/w/Bessemer_Hyperscale_Data_Center
CATEGORIES:Rezoning,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cd4ce26c71c9f27f@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20251218
DTEND;VALUE=DATE:20251219
SUMMARY:[powertracker] Regulator approval - Stargate Saline Township (Mic
 higan Public Service Commission)
DESCRIPTION:MPSC conditionally approved DTE / Green Chile Ventures specia
 l contracts for 1.4 GW Stargate load\n\nSite: Stargate Saline Township\n
 Decision body: MPSC Commissioners\nAction: Regulator approval\nOutcome: 
 Approved\nSource: https://bridgemi.com/michigan-environment-watch/michig
 an-regulators-approve-contract-for-michigans-first-hyperscale-data-cente
 r/\nPowertracker site page: https://powertracker.io/site/stargate-saline
 -township
LOCATION:Michigan Public Service Commission
URL:https://bridgemi.com/michigan-environment-watch/michigan-regulators-a
 pprove-contract-for-michigans-first-hyperscale-data-center/
CATEGORIES:Regulator approval,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7047b8be6dd60e01@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260112
DTEND;VALUE=DATE:20260113
SUMMARY:[powertracker] Rezoning - Project Delta (Stokes County\, NC)
DESCRIPTION:Initial 1800-acre rezoning approval at Walnut Cove (later voi
 ded over notice violations)\n\nSite: Project Delta\nDecision body: Board
  of Commissioners\nAction: Rezoning\nOutcome: Approved\nSource: https://
 spectrumlocalnews.com/nc/charlotte/news/2026/01/12/stokes-county-propose
 d-data-center-creates-backlash\nPowertracker site page: https://powertra
 cker.io/site/project-delta
LOCATION:Stokes County\, NC
URL:https://spectrumlocalnews.com/nc/charlotte/news/2026/01/12/stokes-cou
 nty-proposed-data-center-creates-backlash
CATEGORIES:Rezoning,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:22000faf8a759ef9@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260129
DTEND;VALUE=DATE:20260130
SUMMARY:[powertracker] Referendum - Gemini Sioux Falls (Sioux Falls\, SD)
DESCRIPTION:Citizen referendum petition fell short (5012 of 6704 needed) 
 to overturn data-center rezoning\n\nSite: Gemini Sioux Falls\nDecision b
 ody: City Clerk / Let Sioux Falls Vote\nAction: Referendum\nOutcome: Den
 ied\nSource: https://dakotafreepress.com/2026/01/31/sioux-falls-data-cen
 ter-referendum-petition-fails-january-chills-signature-collection/\nPowe
 rtracker site page: https://powertracker.io/site/gemini-sioux-falls
LOCATION:Sioux Falls\, SD
URL:https://dakotafreepress.com/2026/01/31/sioux-falls-data-center-refere
 ndum-petition-fails-january-chills-signature-collection/
CATEGORIES:Referendum,Denied
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e9d04e3cb4cdcc1d@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260224
DTEND;VALUE=DATE:20260225
SUMMARY:[powertracker] Zoning vote - Spotsylvania SUP Proposal (Spotsylva
 nia County\, VA)
DESCRIPTION:4-3 vote to require Special Use Permit for all data centers i
 n I / C / O / Village zones\n\nSite: Spotsylvania SUP Proposal\nDecision
  body: Board of Supervisors\nAction: Zoning vote\nOutcome: Approved\nSou
 rce: http://www.fredericksburgfreepress.com/2026/02/25/spotsylvania-boar
 d-of-supervisors-vote-to-require-sup-for-data-centers-set-advertised-tax
 -rate/\nPowertracker site page: https://powertracker.io/site/spotsylvani
 a-sup-proposal
LOCATION:Spotsylvania County\, VA
URL:http://www.fredericksburgfreepress.com/2026/02/25/spotsylvania-board-
 of-supervisors-vote-to-require-sup-for-data-centers-set-advertised-tax-r
 ate/
CATEGORIES:Zoning vote,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d9d20129557b7d54@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260310
DTEND;VALUE=DATE:20260311
SUMMARY:[powertracker] Regulator approval - Colossus 2 (Mississippi DEQ)
DESCRIPTION:Approved xAI request for 41 permanent gas turbines at Southav
 en to power Colossus 2\n\nSite: Colossus 2\nDecision body: MS Environmen
 tal Quality Permit Board\nAction: Regulator approval\nOutcome: Approved\
 nSource: https://www.mississippifreepress.org/mississippi-permit-board-g
 rants-xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-c
 enter/\nPowertracker site page: https://powertracker.io/site/colossus-2
LOCATION:Mississippi DEQ
URL:https://www.mississippifreepress.org/mississippi-permit-board-grants-
 xais-request-for-41-southaven-gas-turbines-to-power-memphis-data-center/
CATEGORIES:Regulator approval,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:1b8fdac742c4add5@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260408
DTEND;VALUE=DATE:20260409
SUMMARY:[powertracker] Rezoning - Project Sail (Newnan) (Coweta County\, 
 GA)
DESCRIPTION:3-2 vote approving rezoning for 830-acre $17B Atlas Developme
 nt campus\n\nSite: Project Sail (Newnan)\nDecision body: Board of Commis
 sioners\nAction: Rezoning\nOutcome: Approved\nSource: https://www.atlant
 anewsfirst.com/2026/04/08/coweta-county-commissioners-approve-rezoning-m
 assive-data-center/\nPowertracker site page: https://powertracker.io/sit
 e/project-sail-newnan
LOCATION:Coweta County\, GA
URL:https://www.atlantanewsfirst.com/2026/04/08/coweta-county-commissione
 rs-approve-rezoning-massive-data-center/
CATEGORIES:Rezoning,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d5df6a3809f8d4da@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260413
DTEND;VALUE=DATE:20260414
SUMMARY:[powertracker] Rezoning - Project Delta (Stokes County\, NC)
DESCRIPTION:Board voided January rezoning over notice violations\; develo
 per DFC must restart approvals\n\nSite: Project Delta\nDecision body: Bo
 ard of Commissioners\nAction: Rezoning\nOutcome: Denied\nSource: https:/
 /www.wfmynews2.com/article/news/local/stokes-county-voids-data-center-re
 zoning-approval-notice-violation-developer-resubmit/83-a62c5473-6496-44e
 e-84c2-24d35494d207\nPowertracker site page: https://powertracker.io/sit
 e/project-delta
LOCATION:Stokes County\, NC
URL:https://www.wfmynews2.com/article/news/local/stokes-county-voids-data
 -center-rezoning-approval-notice-violation-developer-resubmit/83-a62c547
 3-6496-44ee-84c2-24d35494d207
CATEGORIES:Rezoning,Denied
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cfb61e70b29d50fa@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260417
DTEND;VALUE=DATE:20260418
SUMMARY:[powertracker] Court ruling - Stargate Saline Township (Michigan 
 Court of Appeals)
DESCRIPTION:AG Nessel filed claim of appeal challenging MPSC ex parte app
 roval of DTE-Stargate contracts\n\nSite: Stargate Saline Township\nDecis
 ion body: Court\nAction: Court ruling\nOutcome: Pending\nSource: https:/
 /www.michigan.gov/ag/news/press-releases/2026/04/17/ag-nessel-files-appe
 al-of-mpsc-approval-of-dtes-saline-data-center-contracts\nPowertracker s
 ite page: https://powertracker.io/site/stargate-saline-township
LOCATION:Michigan Court of Appeals
URL:https://www.michigan.gov/ag/news/press-releases/2026/04/17/ag-nessel-
 files-appeal-of-mpsc-approval-of-dtes-saline-data-center-contracts
CATEGORIES:Court ruling,Pending
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:7d89e464606658b0@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260421
DTEND;VALUE=DATE:20260422
SUMMARY:[powertracker] Rezoning - Bessemer Hyperscale Campus (Bessemer\, 
 AL)
DESCRIPTION:Approved 914-acre expansion rezoning from agricultural to lig
 ht industrial\n\nSite: Bessemer Hyperscale Campus\nDecision body: City C
 ouncil\nAction: Rezoning\nOutcome: Approved\nSource: https://abc3340.com
 /news/local/alabama-bessemer-approves-rezoning-of-914-acres-for-project-
 marvel-data-center-april-2026\nPowertracker site page: https://powertrac
 ker.io/site/bessemer-hyperscale-campus
LOCATION:Bessemer\, AL
URL:https://abc3340.com/news/local/alabama-bessemer-approves-rezoning-of-
 914-acres-for-project-marvel-data-center-april-2026
CATEGORIES:Rezoning,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:d5d32f2c55f52b02@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260424
DTEND;VALUE=DATE:20260425
SUMMARY:[powertracker] Regulator approval - Stratos Project (Utah MIDA)
DESCRIPTION:Created Stratos Project Area for 40000-acre 9 GW Box Elder ca
 mpus\n\nSite: Stratos Project\nDecision body: MIDA Board of Directors\nA
 ction: Regulator approval\nOutcome: Approved\nSource: https://utahnewsdi
 spatch.com/2026/05/04/box-elder-commissioners-approve-data-center/\nPowe
 rtracker site page: https://powertracker.io/site/stratos-project
LOCATION:Utah MIDA
URL:https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-appro
 ve-data-center/
CATEGORIES:Regulator approval,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:cc69a76733037b3d@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260504
DTEND;VALUE=DATE:20260505
SUMMARY:[powertracker] Zoning vote - Stratos Project (Box Elder County\, 
 UT)
DESCRIPTION:Unanimous approval of plans for 40000-acre 9 GW Stratos campu
 s in Hansel Valley (no public comment taken)\n\nSite: Stratos Project\nD
 ecision body: Board of County Commissioners\nAction: Zoning vote\nOutcom
 e: Approved\nSource: https://utahnewsdispatch.com/2026/05/04/box-elder-c
 ommissioners-approve-data-center/\nPowertracker site page: https://power
 tracker.io/site/stratos-project
LOCATION:Box Elder County\, UT
URL:https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-appro
 ve-data-center/
CATEGORIES:Zoning vote,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a65c723173580471@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260504
DTEND;VALUE=DATE:20260505
SUMMARY:[powertracker] Rezoning - Martindale-Brightwood (Indianapolis\, IN)
DESCRIPTION:Approved Metrobloks 14-acre data center rezoning at 2505 N Sh
 erman Ave despite community opposition\n\nSite: Martindale-Brightwood\nD
 ecision body: City-County Council\nAction: Rezoning\nOutcome: Approved\n
 Source: https://www.aol.com/articles/indy-councilors-call-data-center-01
 2653398.html\nPowertracker site page: https://powertracker.io/site/marti
 ndale-brightwood
LOCATION:Indianapolis\, IN
URL:https://www.aol.com/articles/indy-councilors-call-data-center-0126533
 98.html
CATEGORIES:Rezoning,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:65940910a1daa15f@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260505
DTEND;VALUE=DATE:20260506
SUMMARY:[powertracker] Court ruling - Project Sail (Newnan) (Coweta Count
 y Superior Court\, GA)
DESCRIPTION:Residents filed lawsuit seeking to invalidate Project Sail re
 zoning citing due process violations\n\nSite: Project Sail (Newnan)\nDec
 ision body: Court\nAction: Court ruling\nOutcome: Pending\nSource: https
 ://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-project-sail-
 data-center/\nPowertracker site page: https://powertracker.io/site/proje
 ct-sail-newnan
LOCATION:Coweta County Superior Court\, GA
URL:https://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-proje
 ct-sail-data-center/
CATEGORIES:Court ruling,Pending
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:283cb3dbe66900c2@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260512
DTEND;VALUE=DATE:20260513
SUMMARY:[powertracker] Special-use permit - DAMAC Edgerton (Edgerton\, KS)
DESCRIPTION:Final site plan tabled 2-2 pending developer answers on noise
  levels and expansion plans\n\nSite: DAMAC Edgerton\nDecision body: Plan
 ning Commission\nAction: Special-use permit\nOutcome: Tabled\nSource: ht
 tps://edgertonks.org/wp-content/uploads/PC2026-05-12-PACKET.pdf\nPowertr
 acker site page: https://powertracker.io/site/damac-edgerton
LOCATION:Edgerton\, KS
URL:https://edgertonks.org/wp-content/uploads/PC2026-05-12-PACKET.pdf
CATEGORIES:Special-use permit,Tabled
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:ccc48d1f8675eb60@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260512
DTEND;VALUE=DATE:20260513
SUMMARY:[powertracker] Moratorium vote - Hill County Pause Sites (Hill Co
 unty\, TX)
DESCRIPTION:3-2 vote approved 1-year moratorium on data-center constructi
 on in unincorporated areas (first TX county)\n\nSite: Hill County Pause 
 Sites\nDecision body: Commissioners Court\nAction: Moratorium vote\nOutc
 ome: Approved\nSource: https://www.texastribune.org/2026/05/12/texas-hil
 l-county-approves-data-center-construction-pause-ai/\nPowertracker site 
 page: https://powertracker.io/site/hill-county-pause-sites
LOCATION:Hill County\, TX
URL:https://www.texastribune.org/2026/05/12/texas-hill-county-approves-da
 ta-center-construction-pause-ai/
CATEGORIES:Moratorium vote,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:188e49db9b627dc0@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260513
DTEND;VALUE=DATE:20260514
SUMMARY:[powertracker] Moratorium vote - Project Bluestem (Leavenworth Co
 unty\, KS)
DESCRIPTION:3-2 vote enacting 90-day data-center development moratorium c
 overing Tonganoxie site\n\nSite: Project Bluestem\nDecision body: Board 
 of County Commissioners\nAction: Moratorium vote\nOutcome: Approved\nSou
 rce: https://www.kshb.com/news/local-news/kansas/leavenworth-county/leav
 enworth-county-commissioners-pass-90-day-moratorium-on-data-centers\nPow
 ertracker site page: https://powertracker.io/site/project-bluestem
LOCATION:Leavenworth County\, KS
URL:https://www.kshb.com/news/local-news/kansas/leavenworth-county/leaven
 worth-county-commissioners-pass-90-day-moratorium-on-data-centers
CATEGORIES:Moratorium vote,Approved
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:59314c0cf3624cad@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260514
DTEND;VALUE=DATE:20260515
SUMMARY:[powertracker] Permit hearing - Slavic Village Campus (Cleveland\
 , OH)
DESCRIPTION:City rejected Lakeland Equity Group permit application for $1
 .6B 35-acre Slavic Village hyperscale\n\nSite: Slavic Village Campus\nDe
 cision body: City Planning / Mayor Bibb\nAction: Permit hearing\nOutcome
 : Denied\nSource: https://signalcleveland.org/cleveland-rejects-data-cen
 ter-permit-for-slavic-village/\nPowertracker site page: https://powertra
 cker.io/site/slavic-village-campus
LOCATION:Cleveland\, OH
URL:https://signalcleveland.org/cleveland-rejects-data-center-permit-for-
 slavic-village/
CATEGORIES:Permit hearing,Denied
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:753c7db9f3f461df@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260518
DTEND;VALUE=DATE:20260519
SUMMARY:[powertracker] Moratorium vote - Prometheus Hyperscale Natrona (C
 heyenne\, WY)
DESCRIPTION:Hearing on Moody 12-month moratorium ordinance affecting up t
 o 70 proposed Cheyenne-area data centers\n\nSite: Prometheus Hyperscale 
 Natrona\nDecision body: City Council Public Services Committee\nAction: 
 Moratorium vote\nOutcome: Scheduled\nSource: https://capcity.news/commun
 ity/city/2026/05/11/cheyenne-city-council-to-introduce-data-center-morat
 orium-bill-buy-thomes-avenue-senior-center/\nPowertracker site page: htt
 ps://powertracker.io/site/prometheus-hyperscale-natrona
LOCATION:Cheyenne\, WY
URL:https://capcity.news/community/city/2026/05/11/cheyenne-city-council-
 to-introduce-data-center-moratorium-bill-buy-thomes-avenue-senior-center/
CATEGORIES:Moratorium vote,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:01d5a23aeef659c2@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260521
DTEND;VALUE=DATE:20260522
SUMMARY:[powertracker] Court ruling - PW Digital Gateway (QTS) (Virginia 
 Supreme Court)
DESCRIPTION:Deadline for plaintiffs to file opposition to QTS petition fo
 r appeal of PW Digital Gateway zoning cancellation\n\nSite: PW Digital G
 ateway (QTS)\nDecision body: Court\nAction: Court ruling\nOutcome: Sched
 uled\nSource: https://wtop.com/prince-william-county/2026/05/whats-next-
 for-the-digital-gateway-data-center-appeal-to-the-virginia-supreme-court
 /\nPowertracker site page: https://powertracker.io/site/pw-digital-gatew
 ay-qts
LOCATION:Virginia Supreme Court
URL:https://wtop.com/prince-william-county/2026/05/whats-next-for-the-dig
 ital-gateway-data-center-appeal-to-the-virginia-supreme-court/
CATEGORIES:Court ruling,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:486253d9d872d80a@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260610
DTEND;VALUE=DATE:20260611
SUMMARY:[powertracker] Grid interconnection - SB Energy Portsmouth (Ohio 
 Power Siting Board)
DESCRIPTION:Local public hearing in Piketon-area transmission cases tied 
 to 10 GW Portsmouth data-center campus\n\nSite: SB Energy Portsmouth\nDe
 cision body: OPSB Commissioners\nAction: Grid interconnection\nOutcome: 
 Scheduled\nSource: https://aeptransmission.com/ohio/PiketonArea/\nPowert
 racker site page: https://powertracker.io/site/sb-energy-portsmouth
LOCATION:Ohio Power Siting Board
URL:https://aeptransmission.com/ohio/PiketonArea/
CATEGORIES:Grid interconnection,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:258622a630e1e806@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260615
DTEND;VALUE=DATE:20260616
SUMMARY:[powertracker] Court ruling - PW Digital Gateway (QTS) (Virginia 
 Supreme Court)
DESCRIPTION:Writ panel hearing on QTS petition for appeal (late May / ear
 ly June window\; mid-month estimated)\n\nSite: PW Digital Gateway (QTS)\
 nDecision body: Writ panel (3 justices)\nAction: Court ruling\nOutcome: 
 Scheduled\nSource: https://wtop.com/prince-william-county/2026/05/whats-
 next-for-the-digital-gateway-data-center-appeal-to-the-virginia-supreme-
 court/\nPowertracker site page: https://powertracker.io/site/pw-digital-
 gateway-qts
LOCATION:Virginia Supreme Court
URL:https://wtop.com/prince-william-county/2026/05/whats-next-for-the-dig
 ital-gateway-data-center-appeal-to-the-virginia-supreme-court/
CATEGORIES:Court ruling,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:33ec500d5706b46a@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260625
DTEND;VALUE=DATE:20260626
SUMMARY:[powertracker] Court ruling - Frederick CDI Referendum (Frederick
  County Circuit Court\, MD)
DESCRIPTION:Final-brief deadline in consolidated Quantum Maryland lawsuit
 s seeking to keep CDI-OZ referendum off Nov ballot\n\nSite: Frederick CD
 I Referendum\nDecision body: Court\nAction: Court ruling\nOutcome: Sched
 uled\nSource: https://www.fredericknewspost.com/news/continuing_coverage
 /data_centers/data-center-zone-referendum-cases-consolidated-deadlines-s
 till-in-question/article_c5638826-5056-5bd1-8087-fb8e8debedfa.html\nPowe
 rtracker site page: https://powertracker.io/site/frederick-cdi-referendum
LOCATION:Frederick County Circuit Court\, MD
URL:https://www.fredericknewspost.com/news/continuing_coverage/data_cente
 rs/data-center-zone-referendum-cases-consolidated-deadlines-still-in-que
 stion/article_c5638826-5056-5bd1-8087-fb8e8debedfa.html
CATEGORIES:Court ruling,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:369c80eb13c771c7@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260715
DTEND;VALUE=DATE:20260716
SUMMARY:[powertracker] Referendum - Stratos Project (Box Elder County\, UT)
DESCRIPTION:BEAR referendum signature deadline (~45 days after county app
 roval)\; 5422 signatures needed to send Stratos to voters\n\nSite: Strat
 os Project\nDecision body: County Clerk / BEAR group\nAction: Referendum
 \nOutcome: Scheduled\nSource: https://utahnewsdispatch.com/2026/05/14/bo
 x-elder-county-group-wants-referendum-on-proposed-data-center/\nPowertra
 cker site page: https://powertracker.io/site/stratos-project
LOCATION:Box Elder County\, UT
URL:https://utahnewsdispatch.com/2026/05/14/box-elder-county-group-wants-
 referendum-on-proposed-data-center/
CATEGORIES:Referendum,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e989f78acea22dcb@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260721
DTEND;VALUE=DATE:20260722
SUMMARY:[powertracker] Special-use permit - DAMAC Edgerton (Edgerton\, KS)
DESCRIPTION:Re-list of DAMAC application after May 12 tabling\; developer
  must return with decibel + expansion specifics (date estimated)\n\nSite
 : DAMAC Edgerton\nDecision body: Planning Commission\nAction: Special-us
 e permit\nOutcome: Scheduled\nSource: https://johnsoncountypost.com/2026
 /05/14/edgerton-data-center-plan-286461/\nPowertracker site page: https:
 //powertracker.io/site/damac-edgerton
LOCATION:Edgerton\, KS
URL:https://johnsoncountypost.com/2026/05/14/edgerton-data-center-plan-28
 6461/
CATEGORIES:Special-use permit,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:a684d901e72a4bc0@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260811
DTEND;VALUE=DATE:20260812
SUMMARY:[powertracker] Moratorium vote - Project Bluestem (Leavenworth Co
 unty\, KS)
DESCRIPTION:90-day moratorium enacted May 13 expires unless extended\; op
 position group seeking 18-month extension\n\nSite: Project Bluestem\nDec
 ision body: Board of County Commissioners\nAction: Moratorium vote\nOutc
 ome: Scheduled\nSource: https://www.kshb.com/news/local-news/kansas/leav
 enworth-county/leavenworth-county-commissioners-pass-90-day-moratorium-o
 n-data-centers\nPowertracker site page: https://powertracker.io/site/pro
 ject-bluestem
LOCATION:Leavenworth County\, KS
URL:https://www.kshb.com/news/local-news/kansas/leavenworth-county/leaven
 worth-county-commissioners-pass-90-day-moratorium-on-data-centers
CATEGORIES:Moratorium vote,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:b09f02ac63b57cb1@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260915
DTEND;VALUE=DATE:20260916
SUMMARY:[powertracker] Planning review - Remington Innovation Campus (Fau
 quier County\, VA)
DESCRIPTION:Hearings on SDC Capital Partners comprehensive-plan amendment
  + zoning-map amendment for 204-acre 7-building campus (date estimated\;
  CPA deadline was July 1)\n\nSite: Remington Innovation Campus\nDecision
  body: Planning Commission\nAction: Planning review\nOutcome: Scheduled\
 nSource: https://www.fauquiernow.com/news/southern-fauquier-data-center-
 project-includes-land-owned-by-supervisor-culbertson-critics-call-for-re
 cusal/article_87d079a8-6135-4828-a328-12ca6cd80b35.html\nPowertracker si
 te page: https://powertracker.io/site/remington-innovation-campus
LOCATION:Fauquier County\, VA
URL:https://www.fauquiernow.com/news/southern-fauquier-data-center-projec
 t-includes-land-owned-by-supervisor-culbertson-critics-call-for-recusal/
 article_87d079a8-6135-4828-a328-12ca6cd80b35.html
CATEGORIES:Planning review,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:53223f493ce00003@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260915
DTEND;VALUE=DATE:20260916
SUMMARY:[powertracker] Rezoning - Charles City Diode Campus (Charles City
  County\, VA)
DESCRIPTION:Diode withdrew Roxbury Technology Park 515-acre application A
 ug 18 2025\; no resubmission filed (placeholder date if refiled)\n\nSite
 : Charles City Diode Campus\nDecision body: Board of Supervisors\nAction
 : Rezoning\nOutcome: Pending\nSource: https://virginiabusiness.com/devel
 oper-pulls-out-of-massive-charles-city-county-data-center/\nPowertracker
  site page: https://powertracker.io/site/charles-city-diode-campus
LOCATION:Charles City County\, VA
URL:https://virginiabusiness.com/developer-pulls-out-of-massive-charles-c
 ity-county-data-center/
CATEGORIES:Rezoning,Pending
STATUS:TENTATIVE
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:e694a9ae789c452b@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:[powertracker] Rezoning - Project Delta (Stokes County\, NC)
DESCRIPTION:DFC Stokes LLC resubmission of voided rezoning\; date TBD pen
 ding public information meetings + planning-board review\n\nSite: Projec
 t Delta\nDecision body: Planning Board\nAction: Rezoning\nOutcome: Sched
 uled\nSource: https://myfox8.com/news/north-carolina/stokes/stokes-count
 y-votes-to-start-proposed-data-center-development-over-again-after-lawsu
 it/\nPowertracker site page: https://powertracker.io/site/project-delta
LOCATION:Stokes County\, NC
URL:https://myfox8.com/news/north-carolina/stokes/stokes-county-votes-to-
 start-proposed-data-center-development-over-again-after-lawsuit/
CATEGORIES:Rezoning,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:5df67c16fed6f258@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20260930
DTEND;VALUE=DATE:20261001
SUMMARY:[powertracker] Tax abatement / performance agreement - Berry Hill
  Megasite (Pittsylvania County\, VA)
DESCRIPTION:Adoption of Stack Infrastructure SAC III performance agreemen
 t (2050 jobs / $73B over 30 yrs)\; final timing TBD\n\nSite: Berry Hill 
 Megasite\nDecision body: Board of Supervisors\nAction: Tax abatement / p
 erformance agreement\nOutcome: Scheduled\nSource: https://godanriver.com
 /news/local/business/development/article_5ec4b6da-1fb1-43c0-adca-d7035ec
 3b041.html\nPowertracker site page: https://powertracker.io/site/berry-h
 ill-megasite
LOCATION:Pittsylvania County\, VA
URL:https://godanriver.com/news/local/business/development/article_5ec4b6
 da-1fb1-43c0-adca-d7035ec3b041.html
CATEGORIES:Tax abatement / performance agreement,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:6edf5bdf67fedf96@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20261103
DTEND;VALUE=DATE:20261104
SUMMARY:[powertracker] Referendum - Frederick CDI Referendum (Frederick C
 ounty\, MD)
DESCRIPTION:Ballot question on whether to keep CDI-OZ 2614-acre overlay z
 one (22169 valid signatures certified)\n\nSite: Frederick CDI Referendum
 \nDecision body: County voters\nAction: Referendum\nOutcome: Scheduled\n
 Source: https://ccanactionfund.org/frederick-county-residents-gather-an-
 impressive-21029-valid-signatures-to-put-controversial-data-center-expan
 sion-project-on-the-ballot/\nPowertracker site page: https://powertracke
 r.io/site/frederick-cdi-referendum
LOCATION:Frederick County\, MD
URL:https://ccanactionfund.org/frederick-county-residents-gather-an-impre
 ssive-21029-valid-signatures-to-put-controversial-data-center-expansion-
 project-on-the-ballot/
CATEGORIES:Referendum,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
BEGIN:VEVENT
UID:05a5af2732eff408@powertracker.io
DTSTAMP:20260518T024253Z
DTSTART;VALUE=DATE:20261130
DTEND;VALUE=DATE:20261201
SUMMARY:[powertracker] Planning review - Prometheus Hyperscale Natrona (N
 atrona County\, WY)
DESCRIPTION:Site-plan / zoning review for workforce hub + gas-fired gener
 ation (data halls fall in Converse County)\; using 2022 zoning resolutio
 n (date estimated)\n\nSite: Prometheus Hyperscale Natrona\nDecision body
 : Planning Department\nAction: Planning review\nOutcome: Scheduled\nSour
 ce: https://oilcity.news/community/business/2025/10/10/prometheus-hypers
 cale-plans-data-hall-energy-infrastructure-in-natrona-county/\nPowertrac
 ker site page: https://powertracker.io/site/prometheus-hyperscale-natrona
LOCATION:Natrona County\, WY
URL:https://oilcity.news/community/business/2025/10/10/prometheus-hypersc
 ale-plans-data-hall-energy-infrastructure-in-natrona-county/
CATEGORIES:Planning review,Scheduled
STATUS:CONFIRMED
TRANSP:TRANSPARENT
END:VEVENT
END:VCALENDAR